Bathroom After
Complete rebuild of bathroom walls and ceiling. Built in cupboards, toilet, bidet, sinks and shower installed.
Bathroom After
Complete rebuild of bathroom walls and ceiling. Built in cupboards, toilet, bidet, sinks and shower installed.
Bracket and Hidden Cables
Tv mounted on the wall. The sockets to the right - top and bottom are connected via a hidden tube plastered over to send wires down with dust trap bristles on the outside. Once the TV is mounted - no more cables visible hanging down.
Bathroom - Before / After
Bathroom removed. New toilet, bath, shower, sink and tiled walls/floor.
Bathroom - Before / After
Bathroom removed. New toilet, bath, shower, sink and tiled walls/floor.
Plastered wall - suffered with damp
The wall had damp proof material battened over, boarded and plastered. A vent to allow air to move through freely installed.
Reclaimed wood
Wood from an attic conversions old beams, planed and sanded.

Removed from one side of Bristol to another.

The customer then finished with varnish themselves.
Lounge
Built in cupboards
Loft Ladder Install
Fireplace Swap - Before and After
Fire Place - remove and plaster, blend s
Feature Wallpaper
Doors
Bathroom Ceiling - Plaster
Cupboard
Cork Floor
Show More

Free Quotes Around Bristol. Call - Mark Batchelor 07779 725 627 or Sam Batchelor 07710 480 904

Cupboard